Two categories of membership are foreseen in
ETSO: Full membership and associate membership.
Full membership is subject to the following minimum requirements:
- To be a legal person constituted under the laws of his country
of origin;
- To be designated as a Transmission System Operator according
to any Regulation or Directive in force concerning common rules
for the Internal Electricity Market;
- the Transmission System Operator is solely responsible for
the frequency control (primary and secondary) and for maintaining
the energy interchange at the scheduled value within a given
area (Control Area) which is located within the European Union
or in a country that has entered into an agreement with the
European Union providing that it shall comply with the applicable
regulations regarding the Internal Electricity Market.
- To belong to a country or control area relevant to the IEM
in terms of market conditions and/or the physical reality of
its transmission interconnectors.
Associate membership shall fulfil at least the following minimum
requirements:
- Act as a Transmission System Operator; and
- confirmation that there is a reasonable expectation that the
candidate will qualify for full membership in the near future
on the basis of an assessment performed by the Association and
based on technical, regulatory and market conditions.
|